For importers · February 16, 2026
Certificate or declaration: how to understand what your product needs
How the forms of conformity confirmation differ, and who chooses the right one.
A scheme is the rule by which conformity is proved: what is tested, who does the tests, whether an analysis of production is needed, and for what period the document is issued.
Applicants often think it is enough to choose "certificate" or "declaration". In practice, inside each form there are several schemes, and it is the scheme that decides how much time and money the issuing will take.
| Scheme | Object | Tests | When it is used |
|---|---|---|---|
| 1D | Serial production | Own evidence | Products with a low risk, a manufacturer in the territory of the Union |
| 2D | Batch | Own evidence | One-time delivery |
| 3D | Serial production | Accredited laboratory | The most common scheme for import |
| 4D | Batch | Accredited laboratory | One-time delivery of products with increased requirements |
| 6D | Serial production | Laboratory + certified management system | When the manufacturer has a certified management system in place |
| Scheme | Object | Feature |
|---|---|---|
| 1S | Serial production | Tests of samples and an analysis of the state of production, then inspection control |
| 3S | Batch | Tests of samples from the batch, no inspection control |
| 4S | Single item | Tests of the specific item |
| 9S | Serial production or a batch | Based on an analysis of the technical documentation, for complex equipment in small series |
Automatic selection helps to find out which form and scheme apply to your product: the system shows the regulations and the proposed scheme with a justification. What to do with the result — we explained in a separate article.
In practice it comes down to one question — do you import once or regularly. The answer decides both the cost and how often you will return to the issuing.
| Batch | Serial production | |
|---|---|---|
| What the document is tied to | A specific volume, invoice, delivery | The manufacturer's products in general |
| Period | Not set — lives with the batch | Up to five years |
| Who is the applicant | Including the importer and the seller | The manufacturer or an authorized person |
| Analysis of production | Not done | Under some certification schemes — yes |
| Inspection control | No | Yes, for certification |
| When it is more profitable | A one-time purchase, a trial batch | Regular deliveries of one range of products |
A guide: if you plan more than two or three deliveries a year, a serial document pays for itself. If the range changes all the time, a batch scheme is more flexible.
This is the element that sets scheme 1s apart from the others, and it scares applicants more than it should. Experts visit the production site and check whether the production can steadily release products that conform to the tested sample.
They usually look at the following:
For import this means a visit to a foreign site — time and money. This is why importers more often choose schemes that do not include an analysis of production.
A scheme that looks attractive on paper: tests plus a certified management system instead of an analysis of production. The hidden problem is that certification of a management system is a separate project with its own terms and cost.
It is justified if you already have a management system that is maintained for other reasons — for example, customers require it. Setting it up specially for scheme 6d is almost always more expensive than going through an ordinary scheme.
| What the scheme adds | Effect on time |
|---|---|
| Tests in an accredited laboratory | The main part of the time, depends on the parameters |
| Sampling by a representative of the laboratory | Plus logistics and agreeing on the visit |
| Analysis of the state of production | Noticeably longer, for a foreign site — the longest |
| Certification of a management system | A separate project, months |
| Inspection control | Does not affect the issuing time, but appears later |
The general principle: the higher the risk of the product, the more elements the scheme has, and the longer and more expensive the issuing. An attempt to choose a "simpler" scheme for products that must be certified is not an optimization but a violation. How the form of conformity assessment itself is determined — in a separate article.
For importers · February 16, 2026
How the forms of conformity confirmation differ, and who chooses the right one.
HS code (TN VED) · March 7, 2026
How the code is built, what affects classification, and what a mistake at import means.
For manufacturers · May 16, 2026
The manufacturer’s steps from the idea to labeling of the finished product.