Home · Blog · Cost

How much document issuing costs and what the price consists of

There is no honest answer to the question "how much does it cost" without a description of the product. But the structure of costs is clear — if you know it, you can tell a reasonable offer from one with no work behind it.

There is no honest answer to the question "how much does certification cost" without a description of the product. But the structure of costs is clear — if you know it, you can tell a reasonable offer from one with no work behind it. Let us look at what the sum consists of, what moves it, and which figures should make you careful.

Why the price cannot be named at once

The cost is set not by the type of document but by the amount of work behind it. Two products that look similar may differ several times.

What changes the sumWhy
Form of conformity assessmentA declaration, a certificate and state registration are different amounts of procedures
Number of regulationsAn electrical appliance is covered by three at once, a T-shirt by one
Number of parametersEach parameter is a separate test
SchemeA batch is cheaper than a series, but is repeated every time
Number of models in the listSometimes a product line can be combined, sometimes not
Place of productionAn analysis of the state of production abroad costs more
Destructive testsSamples are used up and are not returned

So the question "how much does a declaration cost" sounds like "how much does a repair cost": until you say what kind of apartment it is, the answer will be either meaningless or untrue.

What the sum consists of

The structure is almost always the same, only the shares change.

Inspection control is the cost that is forgotten A certificate for serial production comes with periodic checks during the whole validity period. This is not a one-time expense but an annual one. When comparing a serial scheme and a batch scheme, you must count it, otherwise the economics will be wrong.

What really makes it more expensive

What makes it cheaper — legally

You can save, and there are more ways than it seems. All of them are about preparation, not about avoiding the requirements.

Red flags in offers

In this niche there are many offers with no work behind them. The signs are easy to recognize.

What you hearWhat it means
They name a price without asking about the productThey sell paper, not a conformity assessment
"A document in one day"Tests physically do not take that long
"No samples and no tests"There is no evidence
The price is several times lower than the marketThey save on what makes up the procedure
They do not ask for composition, purpose, photographsThey do not analyze the product
"We issue certificates ourselves"Check the accreditation: a laboratory has no right to issue certificates
They are not ready to show who does the testsA laboratory can always be checked in the register

An important point about liability: the applicant, that is you, is responsible for the truthfulness of the data in the declaration. Not the one who issued it and not the one who took the money. A cheap document without tests is not money saved but a risk taken on. How to check a contractor — in the article about the accreditation register.

Compare what can be compared Two offers with a threefold difference usually differ not in markup but in content: one has a full set of parameters and an accredited laboratory, the other has a minimum or nothing. Ask for a breakdown: which regulations, which scheme, which tests, which laboratory, whether inspection control is included.

How to compare offers correctly

The last item is asked least often, but it shows more than the others: a good contractor will answer about rework and repeat tests, and a seller of papers will say "this does not happen".

How to plan the budget

  1. Define the form of conformity assessment and the list of regulations — without this, any estimate is fiction.
  2. Clarify the set of tests based on the parameters, not on the type of product.
  3. Decide on a series or a batch, counting a year of deliveries, not the first one.
  4. Include the samples and their delivery.
  5. Add a reserve for repeat tests — products do not always pass the first time.
  6. For a certificate for a series, include inspection control for the whole period.
  7. Marking as a separate line: the layout, the print run, possible reprinting.

How to choose between a certificate and a declaration — in a separate article, and how the scheme affects the amount of work — in the review of conformity assessment schemes.

Check your product Describe the product in plain words — the system will show the applicable regulations, the form of conformity assessment and the set of documents, so that you understand the amount of work before you talk to a contractor. Start the check.
Read also

More on documents