Item-level tracking from December 2026: how to prepare production

Batch accounting forgave a lot: wrong items were found at inventory, differences were closed by acts. Item-level tracking turns every error into a stopped acceptance at the buyer.

The move to item-level tracking is not so much a legal change as an operational one. The processes on the line, in the warehouse and in accounting change, and any mismatch between them is immediately visible to the counterparty.

What changes at three points

Where new work appears
01LineApplication, verification, rejection of unreadable codes
02WarehouseAggregation into boxes and pallets, checking at shipment
03DocumentsElectronic waybills with a list of codes
The weak link is usually the third: the line prints, the warehouse assembles, and the documents go out with a mismatch.

Equipment: what you will need

UnitTaskWhat to look at
Label printerPrinting the codesResolution of at least 300 dpi, stability at the speed of the line
Verification cameraChecking readability right after printingRejection rate, integration with line stop
ScannersAggregation and shipmentSpeed, work with film and gloss
Accounting systemStorage and transfer of codesIntegration with electronic document exchange and the labelling system
About a reserve of capacity Calculate the load for the peak shift, not the average one. A line that barely copes on an ordinary day will start to accumulate unlabelled stock at pre-holiday volumes.

Typical errors on the line

What breaks most often

  • The code is printed on a bend or seam of the packaging and is not readable
  • The label is covered with a film that has a glare
  • Aggregation is done “from memory”, without scanning each unit
  • Spoiled codes are not withdrawn from circulation and stay as issued

How to do it right

  • The place for application is chosen on a flat area and tested before launch
  • Verification is placed right after printing, defects are removed automatically
  • Aggregation — only by scanning, with a count check
  • Defects are written off in the system on the same day

Preparation plan

Terms if you start now
Audit of processes and equipment
1–2 weeks
Purchase and installation of units
1–3 months
Integration of the accounting system and electronic document exchange
3–8 weeks
Trial operation
3–4 weeks
Trial operation is planned before the date of the transition, not after — on a real flow, details of the packaging come up.

What to check before the start

Labelling does not cancel the duty to confirm the conformity of products: the information on the declaration or certificate is given in the description of the product. If you launch a new item, it is more convenient to follow the general order — from the analysis of regulations to documents and labelling.

Aggregation: boxes and pallets

Item-level tracking makes scanning of each unit at every transition pointless — otherwise accepting a pallet turns into a procedure of many hours. The solution is aggregation: the codes of single units are linked to the code of the transport package.

The most frequent problem at the start: a box was opened to take one unit and this was not recorded in the system. After that the mismatch goes along the whole chain and comes up at the counterparty's inventory.

Aggregation is a tool, not a duty The requirement of the law is to account for each unit. Aggregation only allows doing this without scanning item by item at every step. But if you work with retail chains and marketplaces, they usually require aggregated deliveries: without this, their acceptance cannot cope.

Defects, wrong items and losses

Real production is never sterile: codes are spoiled during printing, units are broken, surpluses and shortages are found. For each case there is its own order, and it cannot be ignored — otherwise the system and the warehouse diverge.

SituationWhat to do
The code is printed badly and does not scanWrite off the code, apply a new one, record the re-labelling
A unit is damaged before shipmentWithdraw from circulation with the reason “spoilage”
The goods are lostWithdraw from circulation with the reason “loss”
A return from a buyerReturn to circulation if the code is readable; otherwise re-label
An unlabelled unit is foundLabel before sale; it cannot be sold
Wrong items at acceptanceThe difference is recorded in the documents, not “adjusted” by hand

The general rule: any movement other than a planned sale must be reflected in the system. A quiet write-off “in the head” creates a balance that is listed as in circulation and comes up during a check as unaccounted products.

How acceptance changes at counterparties

Item-level tracking affects not only you, but everyone to whom you ship. In practice this means a move to electronic documents and a comparison of compositions.

So preparation should start with a test shipment to one loyal counterparty, not with a full rebuild of the process at the whole volume.

Frequent questions for the transition period

The last point is worth remembering more firmly than the others: having codes does not cancel the declaration, and the declaration does not cancel the codes. What exactly your products need on the conformity confirmation side — in the article on choosing the document form, and the calendar by product groups — in the material on labelling.