TR CU 004 and 020: what electronics and household appliances need

Electronics are almost never covered by one document: power safety and electromagnetic compatibility are different regulations with different tests.

The most frequent mistake in the documents for electronics is to close one regulation and consider the set ready. In practice, most products need at least two documents.

Three regulations that appear together

RegulationWhat it is aboutWhat is checked
TR CU 004/2011Safety of low-voltage equipmentProtection against electric shock, heating, insulation, strength of the design
TR CU 020/2011Electromagnetic compatibilityThe level of interference and the resistance to external interference
TR EAEU 037/2016Restriction of hazardous substancesThe content of lead, mercury, cadmium and other substances
What it looks like in practice An LED lamp powered from the 220 V mains: TR CU 004/2011 and TR CU 020/2011 are mandatory, and TR EAEU 037/2016 applies according to the list of products. There are three regulations, but the tests are partly carried out in one laboratory and in one cycle.

How to understand what applies

A check by the parameters of the product
01Power supplyVoltage and method of connection: mains, adapter or battery
02Electronics insideThe presence of boards and of units that generate interference
03Category of the productWhether the item is in the list of TR EAEU 037/2016
04The setOne, two or three documents
The exact answer is given by the list of products in the regulation itself: it is linked to HS codes (TN VED) and names.

What affects the time

Tests under TR CU 004
5–10 days
Tests under TR CU 020
4–8 days
Assessment under TR EAEU 037
3–7 days

What to check before you apply

How to choose a scheme and how 1d differs from 3d is explained in a separate analysis. What to do if some regulations were missed is explained in the article on mistakes in documents.

What exactly is tested

Three regulations give three independent blocks of tests, and understanding their content helps you estimate the time and the budget in advance.

BlockWhat is checked
Electrical safetyProtection against electric shock, insulation resistance, insulation strength, heating of parts, mechanical strength of the housing
Fire safetyResistance of materials to heat and burning, behaviour in case of a fault
Electromagnetic compatibilityThe level of interference created and the resistance to external interference, including electrostatic discharges and voltage dips
Restriction of harmful substancesThe content of lead, mercury, cadmium and other restricted substances in the materials

Electromagnetic compatibility is most often a surprise: the device is safe and works, but it creates interference above the limit. The fix is a change to the circuit or the shielding, which means a return to the design and not to the papers.

A power supply unit is a separate product An external power adapter falls under the requirements itself. If it is supplied in the set, the question of its conformity is closed together with the device. If it is sold separately, it needs its own document. Replacing the adapter with another one during the deliveries is a reason to review the documents.

What to request from the manufacturer

For importing electronics, the set of technical documentation settles half of the task. You must request it before the contract: after payment the supplier’s interest in correspondence falls sharply.

A separate point: foreign test reports under international standards do not replace the tests here, but they shorten them noticeably if the standards are harmonized. To ignore them completely is to overpay.

Marking and operating documents

For equipment, the requirements for accompanying information are stricter than for most goods, and they are checked without a laboratory.

Frequent reasons for failing the tests

ReasonWhat to do about it
The interference level is exceededA change to the circuit, filters, shielding: a design task
Heating above the permitted levelA change of layout or materials
Insufficient insulation clearancesA redesign of the board or the housing
The housing materials fail in flammabilityReplacing the plastic with one of the right class
The content of restricted substances is exceededReplacing components or solder
The marking on the nameplate does not matchIt is corrected quickly, but the nameplates must be reissued

Five of the six rows are a return to production and not a re-issue of papers. This is why, for a new model, it is sensible to test one sample before the mass order: the cost of preliminary tests cannot be compared with the cost of a batch that cannot be imported.