How to determine the HS code (TN VED) and not make a mistake at customs
How the code is built, what affects classification, and what a mistake at import means.
Home · Blog · Import from China
Most problems with documents are created not at customs but at negotiations — when no one is thinking about documents yet. By the time the container leaves, some decisions are already irreversible.
Most problems with documents in import are created not at customs but at negotiations — when no one is thinking about documents yet. By the time the container has left the port, some decisions are already irreversible. Below is the route in the order in which it must be followed.
The most underestimated stage. Until you know which regulations the product falls under, you know neither the budget, nor the timing, nor what to request from the factory.
If at this step it turns out that state registration is needed, not a declaration, the whole plan shifts by months. It is better to find this out before the prepayment. How to determine the applicability of regulations is covered in the article on product lists.
After payment, the supplier’s interest in correspondence drops sharply. Everything needed is requested at the stage when the supplier is still interested in the deal.
| What to request | Why |
|---|---|
| Full specification: composition, materials, dimensions | Without the composition it is impossible to select the tests |
| Technical diagrams and drawings | Needed for equipment and machinery |
| List of the standards applied | Determines how far the existing test reports can be reused |
| Factory test reports | Reduce the amount of work here |
| Data for labelling: model, manufacturer, address | Will be needed in the documents and on the label |
| Operating manual in the original language | The basis for a translation, not for a retelling |
| Readiness to apply a Russian label at the factory | Cheaper than stickering at a warehouse |
| Consent to receive experts when a series is certified | Otherwise a scheme with analysis of production is impossible |
It makes sense to include the last two items directly in the contract and tie them to payment. The wording “provided on request” does not work in practice.
Testing is carried out here, so the samples must be physically brought in — before the main batch.
More on the rules of selection is in a separate article.
The moment at which almost all newcomers stumble. A Chinese factory cannot be the applicant. The document is issued to a person registered in the Union: to you as the importer or to a person authorised by the manufacturer.
It follows that:
Russian-language labelling must be applied before the goods are released into circulation — that is, before sale, not after a request from the platform.
| Printing at the factory | Stickering at the warehouse | |
|---|---|---|
| Cost | Lower for a print run | Higher, manual labour |
| Quality | The label is part of the packaging | The sticker may peel off |
| Risk of error | The error is replicated across the whole batch | Can be corrected as you go |
| Timing | Requires the layout to be agreed in advance | Delays shipment to the warehouse |
The best option: agree the layout in advance and print at the factory, but be sure to check a trial batch before the print run is launched. The sticker must not cover the mandatory information on the original packaging.
If the product falls into a group under mandatory labelling, the codes are applied before the border is crossed. This is a separate system, not connected with conformity confirmation, and it cannot be satisfied with a declaration.
The calendar by product group is in the article on labelling.
By this moment the documents must be ready: their numbers are stated in the declaration for the goods. What is checked at the junction:
A discrepancy on any item means a request for additional information and the cargo standing at a temporary storage warehouse. What to do in a dispute over the code is covered in the article on classification.
The exact timing depends on the product, but the order of stages and their relative duration are stable.
| Stage | What determines the duration |
|---|---|
| Determining the regulations and the form | Days, if the product is clear |
| Receiving documents from the factory | Depends on its readiness; a frequent point of delay |
| Delivery of samples | Logistics from China |
| Testing | The main part; microbiology and stability take the longest |
| Rework if indicators fail | Return to production, a repeat cycle |
| Issuing and registration | Days if the set of documents is ready |
| State registration instead of a declaration | Months, if applicable |
The most frequent planning error is to count the time from the arrival of the container. You need to count from the date when the product must appear on sale, and go backwards.
Eight items, each of which costs one letter before the deal and weeks of dispute after it.
HS code (TN VED) · March 7, 2026
How the code is built, what affects classification, and what a mistake at import means.
For manufacturers · February 10, 2026
Who takes the samples, how many are needed, and how the sampling act is drawn up.
For importers · June 12, 2026
What most often stops a shipment, and how to prevent it in advance.